New build snagging in Spain: handover checklist and buyer rights

When to snag a new build in Spain, what to check room by room and how to get defects fixed: a snagging checklist and the legal warranty periods.

Last verified: 22 October 20269 min readBased on 15 years’ experience in construction project management
Checklist

Summary

A new build is best inspected before you sign the purchase deed at the notary. That way the defects are on record in good time and you can agree with the developer when they will be put right. This guide covers when to do the snagging inspection, what to bring and what to look for, with a room-by-room snagging checklist. It also sets out the warranty periods under Spanish law and what to do when you find defects.

In short: where you can, inspect the property before the signing at the notary. Make a snagging list with photos and give it to the developer, and keep proof that they received it. The warranty periods run from the date the developer took over the building from the builder, not from the day you got your keys.

Illustrative image: a new-build snagging inspection — checking a sliding door frame with a spirit level
Illustrative image

If you are still choosing a property, read our step-by-step guide to buying property in Spain as a foreigner. It explains what to check before you pay a deposit, how bank guarantees work when you buy off-plan, and what happens at completion.

1. When the new build handover happens

Once construction is finished, the developer tells the buyers and agrees a date for signing the purchase deed at the notary, the escritura pública de compraventa. On that day you pay the rest of the price and receive the keys. Where you can, carry out the snagging inspection before that date.

  1. 1

    Notice

    The developer announces that construction is finished and agrees the completion date.

  2. 2

    Snagging inspection

    1–3 weeks before completion: a check against the snagging checklist.

  3. 3

    Snagging list

    In writing, with photos, to the developer, with proof of receipt.

  4. 4

    Completion and keys

    Signing at the notary, payment of the balance, the keys.

  5. 5

    Re-inspection

    Defects put right and checked before the one-year period ends.

  • Ask the developer for an inspection in writing, in good time. If the developer has not offered a visit before completion, contact them and agree a date. Aim for one to three weeks before completion, so the developer has time to fix what you find.
  • If an inspection before signing is not possible, do the handover inspection straight after you get the keys, before furniture arrives and before any work starts. That avoids arguments about when the damage appeared and whose fault it was.
  • Allow several hours. A two-bedroom apartment with a terrace cannot be checked properly in a short visit.
  • Bring the documents: the contract, the floor plan and the specification of materials (memoria de calidades). Compare the finishes, materials and appliances actually fitted with what the contract and the specification promise.

2. Your rights: the new build warranty periods in Spanish law

The periods during which those involved in the construction are liable to buyers are set in article 17 of the Spanish building act, Ley 38/1999 de Ordenación de la Edificación (LOE).

1year

Finishes and workmanship

Paintwork, tiles, doors, minor unfinished work.

3years

Habitability

Defects in construction elements and building services: damp, leaks, noise, insulation.

10years

Structure

Foundations, columns, beams, floor slabs, load-bearing walls.

The shaded section shows how much of the one-year period has already elapsed by the time you complete the purchase.

Important: the warranty periods do not start on the day you get your keys. They start on the date the developer formally took over the building from the builder (recepción de la obra, article 6 of the same act). Several months can pass between the two dates, so by the time you complete, part of the one-year period for defects in the finishes may already have run. To find the start date, ask for the formal acceptance record (acta de recepción). It forms part of the building logbook (Libro del Edificio), which article 7 of the act says must be handed to the owners.

  • The developer is jointly liable with everyone else involved in the construction (article 17.3). You can therefore claim repairs directly from the developer.
  • You have two years to go to court from the moment the damage appears (article 18). When you find a defect, record it straight away and notify the developer in writing.

3. What to bring

For your own inspection

  • Documents: the contract, the floor plan, the specification of materials (memoria de calidades).
  • A charged phone: photograph every defect close up and from a distance, so it is clear where it is.
  • A torch: light shone along a surface shows up uneven walls and floors.
  • Masking tape: to mark the spots where you find defects.
  • A socket tester or a phone charger: to try every socket.
  • A spirit level and a tape measure: to check falls, flatness and room sizes.

The specialist’s tools

  • A moisture meter: to check walls for damp, especially near windows, in bathrooms and next to the terrace.
  • A thermal camera: shows temperature differences that can point to cold bridges, wet patches or faults in underfloor heating.
  • An RCD and earth tester: for electrical safety.

4. New build snagging checklist

Complete the checklist on your phone. Your selections are saved in your browser.

0 of 52 checkedDefects: 0
    • Floor area and layout match the contract and the plan
    • Finishes, appliances and sanitaryware match the specification (memoria de calidades)
    • Manuals and warranty documents for the appliances and air conditioning handed over
    • Building documents received or requested: the building logbook (Libro del Edificio) with the formal acceptance record
    • Water and electricity meter readings noted and photographed

Defect list

Mark each item OK or Defect. Every defect goes straight into a list you can copy and send to the developer.

Want an engineer to inspect your new build? More than 150 points checked with a moisture meter and thermal camera, and a photo report for the developer.Handover inspection, from €350 

Your selections are saved only in this browser.

5. Found defects? Prepare your snag list and agree the next steps

  • Make a numbered snag list (snagging list) with photos. Each defect is a separate item: the room, what is wrong, one photo from a distance and one close up.
  • Give the list to the developer in writing, before or on the day of signing, and get proof of receipt: a signed copy or a reply by email. Your lawyer decides how to record it in the completion documents.
  • Agree a deadline for the repairs and a re-inspection once they are done. Do not mark a defect as resolved until you have checked the repair.
  • Keep everything: the list, the correspondence, the photos before and after. If the developer drags its feet, this is your evidence.
  • If the developer does not respond, the next step is a formal claim (reclamación) through your lawyer and, for serious defects, a report from an independent expert (peritaje). Keep the two-year limit for going to court in mind (article 18 of Ley 38/1999).

Tip: the first year after you get the keys matters too. Some defects do not show at once: shrinkage cracks, leaks after the first heavy rain, air conditioning problems in summer. Put a re-inspection in your calendar a couple of months before the one-year period for finishes ends.

6. Snagging on your own or with an engineer

You can check many items yourself, including taps, sockets, windows, doors and finishes. Hidden damp, thermal bridges, incorrect drainage falls, electrical faults and departures from the design can be harder to identify. Specialist equipment and experience help with these checks. Defects discovered after the warranty period may be costly to put right.

An engineer at the handover inspection is most useful if you do not live in Spain, do not speak Spanish, or bought off-plan and never saw the building go up.

Questions and answers

Frequently asked questions

How long is the developer's warranty on a new build in Spain?

Under article 17 of Ley 38/1999: one year for defects in the finishes, three years for defects in construction elements and building services that make the home unfit to live in, and ten years for defects in the structure. The periods run from the date the developer took over the building from the builder, not from the day you got your keys.

Who pays to fix the defects?

Within those periods, the developer and the others involved in the construction are liable to buyers for defects, and the developer is jointly liable with all of them (article 17.3 of Ley 38/1999). You claim the repairs from the developer you signed the contract with.

Can I refuse to sign the deed if there are defects?

That depends on your contract and on the defects. Minor unfinished work does not usually give you the right to pull out of the purchase, and pulling out without good grounds can cost you your deposit. Talk to your lawyer before you decide. The usual course is to sign and give the developer a written snagging list with a deadline for the repairs.

Can the handover inspection be done if I am not in Spain?

Yes. A specialist can carry out the inspection on your behalf, with a video call during the visit. If someone has to collect the keys without you, you will need a notarised power of attorney (poder notarial), arranged in advance with your lawyer.

How much does a snagging inspection with an engineer cost?

Our snagging inspection for a flat up to 100 m² starts at €350, including VAT (IVA). It includes checks covering more than 150 items, measurements using a moisture meter and thermal camera, a report with photos in English and a snag list in Spanish for the developer.

Laws and official sources

Official texts in the Spanish Official Gazette (BOE), in Spanish. Article numbers in this guide refer to these texts.

Area guides

Area guides covering prices, schools and transport, checked by the author.

Keep up with changes to rates and taxes

Occasional emails about changes to Euribor, taxes and fees, and new guides. You can unsubscribe at any time. After confirming your subscription, you will receive the one-page “Before you sign” checklist.

After submitting the form, check your inbox and confirm your subscription using the link in the email.